Skip to content

QuickBooks: Read a change order

QuickBooks changeorder.get: arguments, response, policy and SDK examples.

← changeorder operations · Get started · OpenAPI downloads

Contract 2026-10-20 · Operation quickbooks.changeorder.read_a_change_order

Provider route: GET /v3/company/{realmID}/changeorder/{changeorderId}. Alter supplies the connection’s credentials and routing.

Install @alter-ai/sdk @alter-ai/quickbooks with npm, or alter-sdk-quickbooks with pip. Supply your connected customer’s grant ID and the arguments described below.

import { App } from "@alter-ai/sdk";
import { QuickBooksIntegration } from "@alter-ai/quickbooks";
async function execute(input: Parameters<QuickBooksIntegration["changeorder"]["get"]>[0]) {
const app = new App({ apiKey: process.env.ALTER_API_KEY! });
try {
const provider = new QuickBooksIntegration(app, { grantId: process.env.PROVIDER_GRANT_ID! });
const call = await provider.changeorder.get(input);
const result = await call.wait();
return result.bodyJson();
} finally {
await app.close();
}
}
import os
from alter_sdk import App
from alter_sdk_quickbooks import QuickBooksIntegration
async def execute(arguments):
async with App(api_key=os.environ["ALTER_API_KEY"]) as app:
provider = QuickBooksIntegration(app, {"grant_id": os.environ["PROVIDER_GRANT_ID"]})
call = await provider.changeorder.get(arguments)
result = await call.wait()
return result.body_json()
FieldTypePresenceDescription and constraints
$objectRootAdditional keys: not allowed
queryobjectOptionalAdditional keys: not allowed
query.minorversionintegerOptionalMust equal: 75
query.requestidstringOptionalMinimum length: 1
pathobjectRequired within parentAdditional keys: not allowed
path.changeorderIdstringRequired within parentMinimum length: 1

Response media type: application/json. The table describes the pinned successful response. Referenced models link to their complete fields.

FieldTypePresenceDescription and constraints
$objectRootAdditional keys: allowed
timestringOptional
ChangeOrderModelOptionalExpand Read a change order — response body — Change Order

Referenced models: Read a change order — response body — Change Order

SDK function policy ID: quickbooks.changeorder.read_a_change_order. Catalog operation: changeorder/read_a_change_order. Rules can name either ID; function rules distinguish managed calls and conservatively cover raw calls sharing the route. Existing grant permissions and policy rules apply. wait() returns an immediate result or waits for a required approval; it never approves the request itself. Persist the approval ID to resume after a restart.

Provider errors retain their response; JSON decoding raises ProviderAPIError for provider failures. ManagedOperationError identifies contract/input/retention errors. See error handling and provider-specific behavior. Sensitive input may be refused before approval storage. A decoding error never resubmits a write.

Official provider source

Report an issue with this page

Necessary

Required for sign-in, security, authorization, and remembering your choices.

Always active

Analytics

Helps us understand which product and documentation features are useful.

Performance diagnostics

Uses performance tracing and privacy-masked session replay to diagnose problems.

You can change these choices at any time from Cookie settings.